Sunday, October 11, 2009

Progress

Since my last post I've made some progress and should have Jerry Rig II up by mid week. I've finally plumbed the bottom for my WVO collection tank and ready to put it in place. For those going with a stand pipe design you can go to Lowe's and have them add threading to pipe in order for there to be enough thread that comes out of the bottom to attach to needed pipe to connect to system.

Finally found some washers to seal up the hole I slightly made a smidge to big for the electric water heater element.

No comments: